CITYgreen

SWRCSP

Access Road, Channel Crossing
Contour Buffer Strip
Critical Area Planting
Dike
Dry Hydrant
Feedlot Windbreak
Fencing
Field Border
Field Windbreak
Filter Strip
Grade Stabilization Structure
Grassed Waterway
Mulching
Pasture & Hayland Planting
Pipeline
Pond and/or Pond Restoration
Pumping Plant for Water Supply
Range Seeding
Sediment Control Basin
Spring Development
Streambank & Shoreline Protection
Subsurface Drain
Tank or Trough
Terraces
Tree Planting
Underground Outlet
Waste Storage Facility
Water & Sediment Control Basin
Well
Wetland Development or Restoration

NPSP

Failing Septic System Repair
Livestock Waste Systems
Abandoned Water Well Plugging
Soil Testing
Riparian & Wetland Protection

WRPP

KWQBI







Conservation Assistance
Assistance for Conservation Structures

State Water Resources
Cost-Share Program

Access Road, Channel Crossing
Purpose-To provide a means of moving cattle across a creek or stream with minimal disruption to the bed and banks from erosion and sedimentation.

top

Contour Buffer Strip
Purpose-To stabilize the soil, reduce erosion, trap nutrients and pesticides and improve wildlife habitat. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost of grass seeding.

top

Critical Area Planting
Purpose-To stabilize the soil, reduce damage from sediment and runoff to downstream areas and improve wildlife habitat. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for shaping and grass seeding.

Top

Dike
Purpose-To assist in regulating water for protection of feedlots and to make better use of drainage facilities.

Top

Dry Hydrant
Purpose-To provide access to water supplies for use in combating wildfires and prescribed burning.

Top

Feedlot Windbreak
Purpose-To protect soil resources, control snow deposition and provide shelter for livestock. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for tree planting, fencing and mulching.

Top

Fencing
Purpose-To exclude livestock or big game from areas that should be protected from grazing, control domestic livestock while permitting wildlife movement, to protect new seedlings and plantings from grazing, or subdivide grazing land to permit use of grazing systems and utilize grazing management strategies to enhance grass conditions and to prevent concentration of animals in the riparian zone. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for barbwire or mesh fence material.

Top

Field Border
Purpose-To control erosion, to reduce competition from adjacent woodland, if present, and to increase production of wildlife by providing food and/or cover. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for grass seeding.

Top

Field Windbreak
Purpose-To reduce soil erosion, control snow deposition, protect crops and conserve moisture. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for tree planting, fencing and mulching.

Top

Filter Strip
Purpose-To remove sediment and other pollutants from runoff or waste water by filtration, deposition, infiltration, absorption, decomposition and volatilization, thereby reducing pollution and protecting the environment. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for seeding grass.

Top

Grade Stabilization Structure
Purpose-To stabilize the grade and control erosion in natural or artificial channels, to prevent the formation or advance of gullies, and to enhance environment quality and reduce pollution hazards. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for earthwork, pipe and other components associated with pipe installation, grass seeding and fencing. $5,000 maximum payment limit.

Top

Grassed Waterway
Purpose-To provide for the disposal of excess surface water from terraces, diversions or from natural concentrations without damage by erosion or flooding. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for shaping excavation.

Top

Mulching
Purpose-To conserve moisture, prevent surface compaction or crusting, reduce runoff and erosion, control weeds and help establish plant cover. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost of weed barrier fabric.

Top

Pasture and Hayland Planting
Purpose-To reduce erosion and to adjust land use. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for brome or native grass seeding.

Top

Pipeline
Purpose-To convey water from a source of supply to points of use. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for pipe and other components associated with pipe installation.

Top

Pond and/or Pond Restoration
Purpose-To provide water for livestock and to maintain or improve water quality. Note: All livestock water supply practices must be constructed or installed to serve pastures 40 acres or larger. Practices may be installed in pastures less than 40 acres when livestock are excluded from a stream. A cost-share rate of 70% of the county average cost not to exceed 50% of the actual cost for pipe, earthwork, etc. $5,000 maximum payment limit.

Top

Pumping Plant for Water Supply
Purpose-To provide a power source for a dependable alternative water source for livestock that have typically watered from a natural stream and thereby improve and protect the water quality of that stream. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for solar pump and solar panels.

Top

Range Seeding
Purpose-To reduce soil and water loss and to improve water quality. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for native grass seeding.

Top

Sediment Control Basin
Purpose-To abate pollution by providing basins for deposition and storage of sediment and agricultural wastes as part of a livestock waste management program.

Top

Spring Development
Purpose-To improve the distribution of and to increase quantity of water for livestock. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for collection and delivery.

Top

Streambank and Shoreline Protection
Purpose-To stabilize the eroding streambanks, reduce damage from sediment and runoff to downstream areas and improve wildlife habitat. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for shaping, anchors, clamps and tree plantings.

Top

Subsurface Drain
Purpose-To improve the soil environment for vegetative growth by regulating the water table and groundwater, alleviating seepage problems; and to remove surface runoff. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost of pipe.

Top

Tank or Trough
Purpose-To provide watering facilities for livestock at selected locations that will protect vegetative cover through proper distribution of grazing or through better grassland management for erosion control. Another purpose on some sites in order to reduce or eliminate livestock access to streams in order to reduce pollution from animal waste and streambank erosion. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for 600 gallon concrete tank or 100 gallon concrete freeze proof tank.

Top

Terraces
Purpose-To reduce slope length, reduce erosion, reduce sediment content in runoff water, improve water quality, intercept and conduct surface runoff at a non-erosive velocity to a stable outlet, retain runoff for moisture conservation, prevent gully development , reform the land surface, improve famability, or reduce flooding. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for excavation.

Top

Tree Planting
Purpose-To establish or reinforce a stand of trees, to conserve soil and moisture for wildlife habitat or protect watershed. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for tree planting.

Top

Underground Outlet
Purpose-To dispose of excess water from terraces, diversions, sub-surface drains, surface drains, trickle tubes, principal spillways from dam (outside the dam area only) or the other concentrations without causing damage by erosion or flooding. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for pipe and associated components.

Top

Waste Storage Facility or Waste Treatment Lagoon
Purpose-A planned system to manage liquid and solid wastes, including run off from concentrated waste areas, with ultimate disposal in a manner which does not degrade air, soil or water resources. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for earthwork, pipe and concrete.

Top

Water and Sediment Control Basin
Purpose-To trap and collect sediment, reduce on-site erosion, reduce the content of sediment in water, reduce peak rate of flow at downslope locations, reduce flooding, reduce gully erosion, reform land surface and improve the potential of areas for farming. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for earthwork and underground outlets.

Top

Well
Purpose-To facilitate proper use of vegetation on rangeland and pastures and to supply the water requirements of livestock. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for casing.

Top

Wetland Development or Restoration
Purpose-This practice may be used for erosion control, flood storage, flood conveyance, habitat for threatened and endangered species, sediment control, water quality improvement and wildlife habitat. A cost-share rate of 70% of the county average cost not to exceed 70% of the actual cost for earthwork and pipe.